Most AWS bills are not expensive because of one bad decision. They are expensive because of a few hundred small ones nobody owned. The order you review them in matters, because some changes make later ones easier and some make them harder.
1. Get the data you need
Turn on the Cost and Usage Report with resource IDs and send it to S3, or use Cost Explorer with the right grouping. Make sure cost allocation tags are activated. Without this you are guessing.
2. Remove what is plainly unused
- Unattached EBS volumes and old snapshots.
- Elastic IPs that are allocated but not associated.
- Load balancers with no healthy targets.
- Stopped instances still paying for attached storage.
- Idle NAT gateways in accounts that no longer run workloads.
This is low risk and usually the quickest win. Do it before anything else, because it shrinks the baseline you will size commitments against.
3. Schedule non-production
Development and staging rarely need to run at night or on weekends. Scheduling them off is one of the simplest changes with some of the largest effect. Treat it as a policy with an opt-out, not a favour.
4. Right-size
Look at CPU, memory and network over a representative period, not a quiet week. Compute Optimizer is a reasonable first input. Apply changes gradually and watch for throttling.
5. Fix storage and data transfer
- Add S3 lifecycle rules, and consider Intelligent-Tiering for data with unpredictable access.
- Move gp2 volumes to gp3 where it fits.
- Look at NAT gateway data processing and cross-AZ traffic. See our note on cutting NAT gateway and egress costs.
6. Choose cheaper capacity where the workload allows
Graviton instances for supported software, and Spot for fault-tolerant work such as batch jobs and stateless workers.
7. Commit last
Savings Plans and reservations come last because they should be sized to what you will still run after the steps above. Read Savings Plans vs Reserved Instances before buying.
8. Make it stick
Budgets and anomaly alerts routed to the people who can act, a tag policy enforced in your infrastructure code, and a monthly review of the top movers. A cost review that happens once is a clean-up; one that happens monthly is a practice.
If you want a second pair of eyes on your bill, the Free Cloud Cost Assessment follows this same order.